Ardakan – Chadormaloo Railway Double Tracking

خلاصه پروژه / طرح: 

Capable of freight transportation (considering existing capacity), 19 million tons
Capable of passenger transportation, 3 pairs of trains

  • Increased running speed of freight and passenger trains.
  • removal of capacity bottlenecks on the entire network
  • increased safety and smooth mobility
  • meeting the demands of freight and passenger
  • connection to the whole railway network and completion of transit routes in the network.

prj in mrud dis

توصيف پروژه
زيرحوزه سرمايه گذاري: 
طول پروژه (كيلومتر): 
201
ظرفيت سالانه محصول پروژه: 

Capable of freight transportation (considering existing capacity), 19 million tons
Capable of passenger transportation, 3 pairs of trains

  • Increased running speed of freight and passenger trains.
  • removal of capacity bottlenecks on the entire network
  • increased safety and smooth mobility
  • meeting the demands of freight and passenger
  • connection to the whole railway network and completion of transit routes in the network.
نوع پروژه : 
Construction
چارچوب قراردادي واگذاري طرح: 
BOT(availability payment)
موقعيت جغرافيايي پروژه: 
Yazd Province • Province: Yazd • Venue of General Dept.: Yazd • Main cities on the route: Ardakan
دوره بهره برداري: 
13
كل سرمايه گذاري (ميليون يورو): 
€239
معيار انتخاب سرمايه گذار: 
lowest price