Ministry of Roads & Urban Development

Deputyship of Transportation Planning & Economics
  • English
  • فارسی

Railways` Investment Procedures

Table of infrastructure projects to increase the capacity of the existing lines is provided in the Table below:

  Length Planned Needed Sources
(Million Euro*)
Double-tracking 3069 2033
Tracking 4613 196
Electrification 2804 3191
Improvement of lines 5115 3346
Renovation and rebuilding of lines 3073 3346
Construction and repairing the route 158
installation of switches with concrete sleeper 1050
Increasing the axle-load from 20 to 25 tons 10453
Total   8766

 

 

Maximum Possible Share of Private Sector Investments and Partnerships in Railway Sector : 

  Investment Field Maximum Possible Share of Private Sector
1 Passenger Wagons 100%
2 Cargo Wagons 100%
3 Locomotives 100%
4 Rolling Stock Maintenance 100%
5 Rolling Stock Maintenance Workshops 100%
6 Operation and Traffic Management 100%
7 Machinery and Equipment Supply 100%
8 Railways, Buildings and Structures Maintenance Workshops 100%
9 Railways and Tracks Maintenance Machinery 100%
10 Railways Stations 20%
11 Signalling Maintenance  100%
12 Consultant Services 80%
13 IT Operation 80%
14 Railways and Tracks Maintenance Services 100%
15 Warehouses, Docks, Cargo Terminals  30%
16 HVAC and Buildings Maintenance 100%
17 Ownership of Industrial tracks and Railways 100%
18